|
John T is making an N-scale display layout, and John M helped out.
|
|
John P put together railings for the Pettengill Circle area, and John T helped him install them.
|
|
Alex and John P failed to coordinate Coke purchase trips.
|
|
We had an Operating Session, with the usual chaotic result, but we did get cars and cards coordinated.
|
|
John P made up a Sketchup drawing for switch throwbars.
|
|
He then got 20 of them made by Shapeways.
|
|
Here's one experimentally in use in F-Yard. It works with no problems.
|