|
David Lambeth visited recently, and as usual he left Progress in his wake. This is a first pass at supports for the 2nd and 3rd levels, to be built as future Progress.
|
|
John M has painted the, um, art which graces the outdoor lunch area at the steel warehouse. This is based on a prototype near Lewsiston, Maine.
|
|
The Berkmannville millpond has been painted, ready for water to be poured.
|
|
New stone walls for the stream flowing out of the pond, and sides for the bridge (note keystone).
|
|
A fence and more soil for the vegetable garden in Pettengill Circle.
|
|
Experiments for cast-putty capstones on the improved bridges at Berkmannville..
|