This page describes work accomplished on the new TMRC layout during
the month of April 2004, as taken from the descriptions posted to
the club mailing list.
Although our control system was designed from the beginning to drive signals,
we haven't been diligent about building and installing them. John Purbrick
scratchbuilt this model based on a drawings from the General Railway Signal
website and on photographs taken at trackside a few miles from Cambridge. The prototype has its ladder on the side rather than the back, so that's the way the model is too.