September '14
This page describes work accomplished on the new TMRC layout during the month of September 2014, as taken from the descriptions posted to the club mailing list.
September 03

A praying mantis was observed in the hallway.
Plywood is progressing for the Central Vermont tracks above staging.
Hybrid steel-wood supports.
Threaded rod support for CV tracks.
New track on new plywood.
A question answered. See November 10 2013.


September 06

So much going on in the club room this evening! Edgerton Open house, build session, David visiting us from the west coast shops and even an op session all in one night!

Alex initiated Diego into the mysteries of layout operation.
On the computer and moving actual trains.
David Lambeth visited and worked on a building for the chemical plant.
It has an interior platform for acccessing the tops of tank cars.
Here's a tank car in place.
Photo of 6 (yes 6!) club members hard at work (from left to right) on building up the frame, introducing new members to the layour, staring into the camera and painting a building


September 13

A whole lot of clamping has been going on in the helix area.
The objective has been to set up an anti-plunge barrier, to make life safer for trains.
In fact trains have operated on the upper level under power!
Alex has set up a tank car loading facility at the chemical plant.
Switch 207 is getting a motor and controls.


September 27

Dillon Battaglia at work with plastic glue.
Mark Green and Bill Onorato stiffened the bridge supports on the second level.
Bill Onorato tests the bridge supports on the second level while Mark Green makes adjustments.
Alex Leder and Dillon at the painting table.
With the final position of the bridge support decided, Mark Green "screws it up."



Previous MonthNext Month
Calendar
2018
JanFebMarApr
MayJunJulAug
SepOctNovDec
2017
JanFebMarApr
MayJunJulAug
SepOctNovDec
2016
JanFebMarApr
MayJunJulAug
SepOctNovDec
2015
JanFebMarApr
MayJunJulAug
SepOctNovDec
2014
JanFebMarApr
11 22 29 01 26 01 12 16 16 26
MayJunJulAug
28 04 20 28 02 05 23 07 10 21
SepOctNovDec
03 06 13 27 31 12 22 6 9 31
2013
JanFebMarApr
MayJunJulAug
SepOctNovDec
2012
JanFebMarApr
MayJunJulAug
SepOctNovDec
2011
JanFebMarApr
MayJunJulAug
SepOctNovDec
2010
JanFebMarApr
MayJunJulAug
SepOctNovDec
2009
JanFebMarApr
MayJunJulAug
SepOctNovDec
2008
JanFebMarApr
MayJunJulAug
SepOctNovDec
2007
JanFebMarApr
MayJunJulAug
SepOctNovDec
2006
JanFebMarApr
MayJunJulAug
SepOctNovDec
2005
JanFebMarApr
MayJunJulAug
SepOctNovDec
2004
JanFebMarApr
MayJunJulAug
SepOctNovDec
2003
JanFebMarApr
MayJunJulAug
SepOctNovDec
2002
JanFebMarApr
MayJunJulAug
SepOctNovDec
2001
JanFebMarApr
MayJunJulAug
SepOctNovDec
2000
JanFebMarApr
MayJunJulAug
SepOctNovDec
1999
JanFebMarApr
MayJunJulAug
SepOctNovDec
1998
JanFebMarApr
MayJunJulAug
SepOctNovDec
1997
JanFebMarApr
MayJunJulAug
SepOctNovDec

Tech Model Railroad Club of MIT
MIT Room N52-118
265 Massachusetts Avenue
Cambridge, MA 02139

+1 617 253-3269
Email: tmrc-web@mit.edu