This page has thumbnails of pictures representing most of the Milestones
from the progress page. They are listed chronologically from most recent
to oldest.
|
Nov 21, 1998
Graphical Switch throwing comes to life. You see here a picture of the
monitor showing a schematic of the new layout. A click with the mouse on
the switches throws that switch!
|
|
Oct 14, 1998
The first Switch Card is installed under the layout. Its location is the
high density switch area at the east entrance of Gifford City.
|
|
Aug 8, 1998
System 2 is now operational and running the layout. With switch throwing
coming soon!
|
|
Jul 11, 1998
The Gifford City structure is completely finished. The next step is to
get the scenery in there! You can see the buildings starting to appear.
|
|
Mar 21, 1998
The old d-board is installed in the new layout, with fully functional
clock!
|
|
Mar 14, 1998
The turntable is operational! This picture is much newer, with the Round
House already connected to the mainline, but you get the idea.
|
|
Feb 21, 1998
The Roundhouse is installed in its final position in the new layout.
|
|
Dec 16, 1998
This is a plan of the layout 'future' and what we have currently built.
Click on the image for a full description.
|
|
Dec 16, 1997
A new tower has risen at TMRC.
|
|
Aug 26, 1997
A short Aaron Burr traversed the new expanded p-yard. The new expanded
yard can be seen in this picture.
|
|
Aug 15, 1997
This is a picture of the now empty 20E-214. All the old layout has been
taken to N52-118, together with tons of materials that will help us build
a new layout.
|
|
Apr 19, 1997
The old layout is de-commissioned. This picture shows the room once all the
layout has been sectioned and packaged, ready to be transported to N52-118.
|