Monthly Update April 2004

30 April 2004


April 30 Although our control system was designed from the beginning to drive signals, we haven’t been diligent about building and installing them. John Purbrick scratchbuilt this model based on a drawings from the General Railway Signal website and on photographs taken at trackside a few miles from Cambridge. The prototype has its ladder on the side rather than the back, so that’s the way the model is too.