| The back alley off from Main St, behind the GC fire station. | The second switch completed in BK. | BK track continues to grow. |
 |  |  |
| Even around the corner! | The CO2 tank is finished! | Another view of the CO2 tank. |
 |  |  |
| The Recycle sign is back up, next to our recently relocated Coke Machine. | And its better than before! | The Green Builiding is nearing completion of its exterior! |
 |  |  |
| A ground level view of the building. | The large radome of the green building (fore) and the small one (back) are the final elements missing, and they are close to being ready! | Pavement is all the way down infront of the carbarn! |
 |  |  |
| And GC station is now located and paved. | A whole view of the paved Main St. | The track feeders for all of SYard. |
 |  |  |
| The System 3 block cards, now connected to the track! | Wire work under S-Yard for both signals and power (S&P !) | The power feeds into terminal blocks where the wire changes from 14ga to 24ga for the last few inches. |
 |  |
| More wires under the layout. | A complete view of the S-Yard east side wiring. |