| Berkmanville Under Construction. | The supports of Berkmanville. | Start of the Bermanville Hand Laid Track...with some tests of brown ballast. |
 |  |  |
| The bottom of the Sys3 Block Card under construction. | The top of the Sys3 Block Card under construction. | The Dispatcher area now features the TMRC Main Clock |
 |  |  |
| The TMRC Main Clock console. | The fronts of the Green Builiding ready to be painted. | Details of the fronts: the bottom columns. |
 |  |  |
| Details of the fronts: the top floor machine room area. | The main body of the Green Building - front view. | The main body of the Green Building - side view. |
 |  |  |
| The new mirror to allow view of P-yard from the Tower. | The left side of the mirror, as seen from the Tower. | The right side of the mirror, as seen from the Tower. |
 |  |  |
| The mockup of the Police Station built by Andy. | The now fully operational P-Yard control panel (with an offline green message, since the System is off!). | The repeater card which also works as a display unit interface. |
 |  |  |
| A general picture of the tower, showing how small the new Sys3 parts are! | Paving work going on in Gifford City by John Shriver. | Another view of the paving. A hard part will be to ramp up to the ramp. |
 |  |  |
| A view down the street into the paving area. | The Staging Yard switch card which is now functional! | The two remaining S-Yard switch cards... which will operate soon. |
 |
| The S-yard ladder now controlled by the operating switch card. |