Apr '01 Pictures

April 21, 2001

Ed added an A/C unit and other roof details to the yet-to-be-named building next to Coca-Bublie.JP added 'semi-brown' ballast to the BK cutoff.Bill and John Shriver added ties to the BK cutoff.
Ed added an A/C unit and other roof details to the yet-to-be-named building next to Coca-Bublie.JP added 'semi-brown' ballast to the BK cutoff.Bill and John Shriver added ties to the BK cutoff.
Yes, there was in fact a table under all the junk, and thanks to Alvar & Bill, now we have proof.Ed is virtually done with the NdeM locomotive, included appropiately orange handrails.The NdeM locomotive is expected to debut during our Open House.
Yes, there was in fact a table under all the junk, and thanks to Alvar & Bill, now we have proof.Ed is virtually done with the NdeM locomotive, included appropiately orange handrails.The NdeM locomotive is expected to debut during our Open House.
Thanks to lots of work done by JP, S-Yard can be used almost completely, one train a time!John wired all the functional S-yard switches to make all the tracks functional!Alvar continued to work on the 2nd Sys3 Block Card, which will let us debug Sys3 during the summer.
Thanks to lots of work done by JP, S-Yard can be used almost completely, one train a time!John wired all the functional S-yard switches to make all the tracks functional!Alvar continued to work on the 2nd Sys3 Block Card, which will let us debug Sys3 during the summer.
Back to April 21, 2001
Tech Model Railroad Club of MIT
MIT Room N52-118
265 Massachusetts Avenue
Cambridge, MA 02139

+1 617 253-3269
x3-3269 (on campus)
Email: tmrc-web@mit.edu
Generated Tue Nov 24 22:05:23 2009
in 0.074 secs