 |  |  |
| The wireless cab, now fully equiped with a System 3 compatible PIC processor, behaved perfectly tonight. | The Berkmanville cutoff sees the start of hand-laid track: here you see the ties in place. | This section of the BK cutoff is awaiting ties. |
 |  |  |
| The Green Building during its initial cote of primer, prior to full color paint. | A side view of the Green Building during the primer painting. | The start of the helix from Berkmanville to S-Yard. |
 |  |  |
| A view of the new IMP unit, now fully operational under a PIC processor for System 3 compatibility. Also shown are its interfaces to System 2. | This is the actual IMP board, which interfaces to the switch cards and remote control panels. | Ed's NdeM locomotive, now looking with a much more realistic grime black coat, awaits in the vegetable warehouse. |
 |  |  |
| The NdeM locomotive pulling the 50th Anniversary train out from Gifford City. | The NdeM locomotive passing infront of the turntable on its way back to Gifford. | A new mockup of the Gifford City Police station, with a taller 1st floor and a lower 2nd floor. |
 |  |  |
| The new parts cabinet installed in the Roundhouse office area. | An aerial view of the Roundhouse office. | The outside of the Roundhouse office. |