 |  |  |
| Berkmanville (BK) construction continues. | BK track goes now into the Helix. | The other end of BK continues to grow too! |
 |  |  |
| Latice stock reaches the current 'end of the world'. | The end of the world connects to the module we built in Building 20. | The module is now fully installed. |
 |  |  |
| John Shriver finished the carbarn switch work! | All the four tracks are finished inside too. | This picutre provides a better look inside. |
 |  |  |
| An overview of the switchwork. | Detailed view of the (very) comples switches. | A new building appeared in Gifford City. |
 |  |  |
| And pavement is growing both infront and behind the buildings. | The new building closes a gap between the bassex hotel and the concrete building. | The new building has a fancy emergency exit which breaks the monotony of the other buildings. |
 |  |  |
| The Green building back in its place (back view). | Front view of the Green building back in place. | The view of the top of the Green building through the mirrors. |
 |  |  |
| New lights will illuminate the front of Gifford City. | Ed brought in some fancy new cars, including these weird flatbeds. | Two new tank cars now are part of TMRC's inventory. |
 |  |  |
| Another view of the new cars. | This new Conrail will also join TMRC. | More details appear in the Rounhouse, including a new gas tank. |
 |  |  |
| A close up of the gas tank. | Andy brought in new storage bins, clearing up a lot of space in the scenery table. | The prototype System3 cards are in! |
 |
| They are in test now. |